Skip to content
Revision: 5 | Effective Date: 2026-06-10

Changelog

This page is an auto-updated changelog of documentation revisions. [1]

Changelog

Procedure Update

Compared refs: HEAD~1 -> HEAD

Changelog

  • Merge pull request 'Attempting to fix the changelog entries.' (#121) from chore/changelog1 into main
  • Attempting to fix the changelog entries.

Procedure Update

Compared refs: HEAD~1 -> HEAD

Printing GC Test Worksheet

  • Merge pull request 'Updating the GCRC worksheet workflow.' (#112) from update/chillers/test-paperwork into main
  • Updating the GCRC worksheet workflow.

Procedure Update

Compared refs: HEAD~1 -> HEAD

Changelog

  • Merge pull request 'Removing the git data from the revision changes. Cleaning up the change log behavior.' (#110) from update/changelog/post-layout into main
  • Removing the git data from the revision changes. Cleaning up the change log behavior.

Procedure Update

Compared refs: HEAD~1 -> HEAD

Changelog

  • Merge pull request 'update the tagging behavior for the updated directories. Added linking to the updated procedures for easy navigation to the updated procedure as well as back-linking to the changelog within the procedure text body.' (#108) from update/blog-post-changelog into main
  • Merge origin/main into update/blog-post-changelog, keep feature branch blog index changes
  • Line changes: +49 / -0
  • Example additions: <li class="tag-c4">cold-heads</li> | <li class="tag-c5">sumitomo</li> | </ul>

Procedure Update

Compared refs: HEAD~1 -> HEAD

CH-110 Cooldown Procedure

  • Added pre-cooldown safety checklist and torque specs for flange hardware
  • Line changes: +14 / -3
  • Added headings: ## Pre-Cooldown Safety Checks

CH-110 Warmup Procedure

  • Added pre-cooldown safety checklist and torque specs for flange hardware
  • Line changes: +5 / -1

Procedure Update

Compared refs: HEAD~1 -> HEAD

<<<<<<< HEAD

docs/blog/index.md

  • Line changes: +4 / -1
  • Added headings: # Changelog; ## Changelog
  • Removed headings: # Blog
  • Example additions: # Changelog | This page is an auto-updated changelog of documentation revisions. | ## Changelog
  • Example removals: # Blog
  • =======

    CH-110 Cooldown Procedure

    • Added pre-cooldown safety checklist and torque specs for flange hardware
    • Line changes: +14 / -3
    • Added headings: ## Pre-Cooldown Safety Checks

CH-110 Warmup Procedure

  • Added pre-cooldown safety checklist and torque specs for flange hardware
  • Line changes: +5 / -1
  • >>>>>>> d8fe45c (update the tagging behavior for the updated directories. Added linking to the updated procedures for easy navigation to the updated procedure as well as back-linking to the changelog within the procedure text body.)